Friday, 6 May 2011

The Network Instalation Project - 06/05/2011

Well I am into the second week of the project. This week I created a Gant chart to have a rough idea of how I am going to plan the whole project, the final timeline for the project will be created after i have defined what needs to be included within the project.

I had a meeting on Thursday of this week with the client about the network. I explained and showed the layout of the network and the design of the topology of network. As we were talking we realized a constraint with the network and that was that the switch can only support the maximum of 4 computers. So we have decided to do a 4 computer network. 1 server and 3 client machines. If in future i was to add more computers, they can daisy chain with the other hub.

Before the meeting I tested all the computers and found 3 perfect computers for my network, i also managed to find the drivers for the server on the computer i am going to be using. When i showed the client my design, i had realized that the tables on the back wall is bigger than i thought, so i re draw my drawing again to be able to put all the computers along the back wall.

I f my client wishes to see the up to date drawing they can let me know. All in all i am on schedule on the time line.

2 comments:

  1. Communication has taken place and you should be ready to fully define the project now.

    ReplyDelete
  2. Having a reliable Web Hosting “Hosting En Domein” service is vital to the continuing success of any website, yet many people seem to have a great deal of difficulty finding such a host. If you are having trouble choosing a web host, the following advice can help you sort out your difficulties and find a service that works for you.


    Netwerk Installeren
    Server Kopen

    ReplyDelete